The basic idea is this: Instead of creating a detailed schedule for a single situation that will never occur, create a set of dynamic policy parameters that works for a range of situations.

The TPS uses one such system. The dynamic policy parameters are the takt time, the kanban levels, and the make-up time. No schedule is created for lines feeding the assembly line. Those lines are controlled by kanban squares.